It’s essential to help safeguard Eeyou land use to maintain current Eeyou way of life. To signify this importance, we evaluated the following components:

  • Navigation: Routes used by the Eeyou on the reservoirs, the Chisasibi (river), also known as the Grande Rivière, and its estuary.

  • Snowmobile Trails: Winter routes used specifically for snowmobile travel.

  • Road Conditions: The Eeyou’s use of roads.

Eeyou Harvesting activities, camps and campsites can be found in Eeyou Land Use: Part 1 fact sheet.

Key Takeaways

Expected changes:

  • Various mitigation measures will help minimize the changes to Eeyou land use, notably by maintaining ongoing communication to inform Eeyou communities of changes that will occur and by ensuring the safety of Eeyou land users who travel and engage in activities in the area.

How was Eeyou knowledge Incorporated into the Study?

Interviews with Eeyou land users identified navigation routes along the reservoirs, the Chisasibi (river), and its estuary. Types of boats used, locations of boat ramps and navigation obstacles (such as sandbars, rapids and debris) were shared. Snowmobile trails used along the reservoirs and along the roads were also identified. Eeyou land users do not travel with snowmobiles on the La Grande 1 reservoir or the Chisasibi (river), as it can be dangerous. Eeyou land users travel on snowmobile trails that run along or cross the Transtaïga Road, the Billy-Diamond Highway and La Grande-3 access road.

Expected Changes

Navigation

Water levels and flow may change downstream of the La Grande-4, La Grande-3 and Robert-Bourassa (La Grande-2) generating stations. However, these changes will be small and are not expected to significantly affect Eeyou navigation.

Snowmobile Trails

No significant changes are expected regarding ice conditions along the snowmobile trails used by the Eeyou on the La Grande 4, La Grande 3 and Robert Bourassa (La Grande 2) reservoirs. Changes to the ice will occur downstream of the La Grande-3 generating station, but this should not affect the snowmobile trails used by the Eeyou, since they are located a good distance from the area that will be affected.

Road Conditions

During construction, the proposed upgrades are expected to result in increased traffic, especially trucks and oversized vehicles on the Billy-Diamond Highway, the Transtaïga Road, and the La Grande-3 and La Grande-4 access roads, which could pose safety risks to land users travelling along or crossing the roads.


Download the Navigation, Land Access and Travel Factsheet.

Eeyou navigation, snowmobile trails and road conditions will all be significantly affected by climate change. For more information, refer to the Climate Change Factsheet.